← Exit
1 / 40
Sanitation
The required positions of rainwater pipes on a new building can be identified in the
a
Building Plan with underground drainage systems details
b
Building Specification with building material specifications
c
Plumbing Specification with plumbing material specifications
d
Work Programme showing the different dwellings under construction
Check answer
Score so far:
0
· pass mark 24